Local Highway Maintenance Transparency Report 2025 - 2026

Section 4.2 - Specific capital maintenance plans for 2025 to 2026

4.2 Carriageway resurfacing /reconstruction 2025 to 2026 

4.21 Classified and bus routes

LocationReason for works being undertakenIndicative cost (£k)Length kmBenefits
A184 Consett route/slip roadSurface/binder course failure67337Extend life make safe
A184 Felling bypassSurface/binder course failure71118Extend life make safe
A694 Spa Well RoadLoss of skid resistance    55175Safety
A1114 Riverside WayLoss of skid resistance    2050Safety 
A1288 Birtley LaneSurface/binder course failure3970Extend life make safe
C302 Lead Road, Greenside    Surface/binder course failure in carriageway64240Extend life make safe
C305 North Street, WinlatonSurface/binder course failure in carriageway55150Extend life make safe
C307 Dunston Bank, DunstonSurface/binder course failure in carriageway92180Extend life make safe
C308 Pennyfine Road, SunnisideSurface/binder course failure in carriageway49245Extend life make safe
Victoria Road, BenshamSurface/binder course failure in carriageway72268Extend life make safe
C326 Askew Road West, RedheughSurface/binder course failure in carriageway50130Extend life make safe
Saltwell View, Saltwell    Surface/binder course failure in carriageway86206Extend life make safe
C315 Coatsworth Road / Whitehall Road, Bensham    Surface/binder course failure in carriageway47103Extend life make safe
C313 Easedale Gardens/Springwell Road/Stanley Gardens, WrekentonSurface/binder course failure in carriageway4580Extend life make safe

4.22 Unclassified roads

LocationReason for works being undertakenIndicative cost (£k)Length kmBenefits
Strothers Road, High SpenSurface course failure in carriageway24133Extend life make safe
Stella Bank, Stella - Low prioritySurface course failure in carriageway1085Extend life make safe
Ancrum Way, WhickhamSurface course failure in carriageway1365Extend life make safe
Prospect Terrace, KibblesworthSurface course failure in carriageway16110Extend life make safe
Mourne Gardens, Lobley Hill - Low priority.
Condition is reasonable
Surface course failure in carriageway14106Extend life make safe
Seventh Avenue, Team ValleySurface/binder course failure in carriageway49101Extend life make safe
Windermere Street West, Bensham. Surface course failure in carriageway33155Extend life make safe
King Street, BenshamSurface course failure in carriageway23119Extend life make safe
Cross Keys Lane, Low FellSurface/binder course failure in carriageway22122Extend life make safe
Harewood Green, Bedale Acomb Court, Allerdene.Surface course failure in carriageway30140Extend life make safe
North Dene, BirtleySurface course failure in carriageway29170Extend life make safe
Taylor Gardens, PelawSurface course failure in carriageway1687Extend life make safe
Ryhope Gardens, WrekentonSurface course failure in carriageway24105Extend life make safe
Suffolk PlaceSurface course failure in carriageway40210Extend life make safe
Elder GroveSurface course failure in carriageway2095Extend life make safe
Dorset AvenueSurface course failure in carriageway10100Extend life make safe
Windermere Street West (rear)Surface course failure in carriageway15112Extend life make safe

4.23 Back lanes

LocationReason for worksCost £kLength (metres)    Benefit
Derwent Street, ChopwellSurface course failure870Extend life make safe
Litchfield Terrace, WinlatonSurface course failure870Extend life make safe
Eleanor Terrace / Edith Terrace, WhickhamSurface course failure23157Extend life make safe
Ravensworth Terrace, DunstonSurface course failure21143Extend life make safe
Caris Street / Roseberry Avenue, DeckhamSurface course failure19150Extend life make safe
Beacon Rise, Sheriff HillSurface course failure1060Extend life make safe
Rochester Terrace / Bondene Avenue West, FellingSurface course failure19125Extend life make safe
West Row / Penshaw View, BirtleySurface course failure20193Extend life make safe
Chilcrosse (Bleachfield), Leam LaneSurface course failure20120Extend life make safe
Cowpath Gardens / Croxdale Terrace, PelawSurface course failure10110Extend life make safe
Deneburn / Hallgarth, Leam Lane    Surface course failure16110Extend life make safe

4.24 Surface dressing

LocationReason for worksCost £kLength (metres)    Benefit
C305 Pawston Road, Barlow / High SpenPrepatch and surface dress1051250Extend life make safe
West Lane and Knobbyends Lane, WinlatonPrepatch and surface dress53610Extend life make safe
Coach Road, Lobley Hill / LamesleyPrepatch and surface dress1122080Extend life make safe
C306 Fellside Road, WhickhamPrepatch and surface dress66435Extend life make safe

4.25 Ultithin programme on unclassified roads 

LocationReason for worksCost £kLength (metres) Benefit
Ridgeway, Leam LaneSurface course failure31330Extend life make safe
Byron Walk, Keats Walk, GatesheadSurface course failure41161Extend life make safe
Derwent View, WinlatonSurface course failure24304Extend life make safe
Park Avenue, Blaydon Surface course failure871Extend life make safe
Runnymede Gardens, Chopwell Surface course failure49383Extend life make safe
Larkspur Road, Whickham  Surface course failure38228Extend life make safe
Blackthorne, Sunniside Surface course failure30131Extend life make safe
Dunston Road, Dunston Surface course failure24120Extend life make safe
Heathfield Road, Low FellSurface course failure32240Extend life make safe
Holyoake Gardens, Deckham Surface course failure36261Extend life make safe

4.3 Footways 

Area where work is plannedType of works being undertakenIndicative cost (£k)Length (m)Benefits 
Mountside Gardens, Dunston HillReplace paving flags with asphalt42227Safety and improved environment.
Queens Court, TeamsReplace paving flags with asphalt46215Safety and improved environment.
Jackson Street phase 2, GatesheadReplace paving flags with asphalt63157Safety and improved environment.
Grisedale / Brampton Gardens, Low Fell (east side)Replace asphalt with stone paving and kerb works43325Safety and improved environment.
Church Road, Sheriff HillReplace paving flags with asphalt2293Safety and improved environment.
Coldwell Park Drive, FellingReplace paving flags with asphalt35154Safety and improved environment.
Redemarsh, Leam LaneReplace paving flags with asphalt42277Safety and improved environment.
Jackson Street phase 1 Re-lay paving flags92157Safety and improved environment.
B6317 Whickham Front StreetRenew existing bitmac footway surfacingTBC220Safety and improved environment.
Burn Road, BlaydonRenew existing bitmac footway surfacingTBC290Safety and improved environment.
Dunston BankRenew existing bitmac footway surfacingTBC450Safety and improved environment.
Chester Gardens, CrawcrookRenew existing bitmac footway surfacingTBC110Safety and improved environment.
Redemarsh, Leam LaneReplace existing flagged footway with BitmacTBC92Safety and improved environment.
B6315 Woodside Lane, GreensideReplace existing flagged footway with BitmacTBC140Safety and improved environment.

4.4 Structures and bridges

Area where work is plannedType of works being undertaken Indicative cost (£k)Benefits
Tyne BridgeMajor maintenance with Newcastle City Council41,400Major maintenance required to ensure future durability of structure. Note Gateshead contribute 40% of cost.
Gateshead viaduct Principal inspection and PTSI stage 1330Duty to inspect and maintain structures. Investigation of known issues.
Gateshead viaduct Demolition18,000Maintenance burden reduced.
Allows town centre regenerationRedheugh Bridge principle inspection TBCDuty to inspect and maintain structures.
Redheugh Bridge

Coping stabilisation

Drainage repairs 

1,000Address risk of spalled coping units and piers.
Lamesley RoadBrick parapet repair10Maintain safety features
Riding Mill Lane public right of way Bridge replacementTBCBridge does not have parapets and is at the end of its life. Repacement options being considered.
Lintzford RoadStabilisation of carriageway

150 (design)

TBC (construct)

Reduces risk of landslip and loss of key transport corridor.
Scotswood bridgePrinciple inspectionTBCDuty to inspect and maintain structures.
Blaydon viaductPrinciple inspection Duty to inspect and maintain structures.
The Gateshead Millennium BridgePrinciple inspection including mechanical and engineeringTBCRefurbishment of some mechanical and engineering elements required to ensure continued use of opening.

4.5 Street lighting

Area where work is plannedType of works being undertaken Indicative cost (£k)Benefits 
Borough wideColumn Replacement Program1.5mUpgrading lighting infrastructure
Borough wideHigh Mast Lantern Replacement61Upgrade the lighting at major conflict areas
Metrocentre ring roadDuct/cable replacement150Infrastructure improvement
Team ValleyDuct/cable replacement    100Infrastructure improvement
Main Gate, Team ValleyLED lantern replacement25Upgrade the lighting at major conflict areas

4.6 Drainage /flooding 

Area where work is plannedType of works being undertaken Indicative cost (£k)Benefits 
Holburn laneInstallation of two dams and culvert100To alleviate flood risk to private land and improve existing culvert inlet making it better for future maintenance.
Gully repairs Repair of existing restricted gulliesNot applicableMaintenance of existing gullies to drain existing highway.
Watergate Park reservoirImplementation of erosion control500To bring the reservoir to latest specification to reduce risk of life in an event.
Ridgeway surface water and flooding alleviation scheme (SWFAS)Installation of new manhole and gullies.40To alleviate flood risk to highway for local community.
Durham Road SWFASRemoval of existing drainage and installation of new highway drainage.TBCTo alleviate flood risk to highway for local community and business.
Arran Road SWFASInstallation of new gully into footway to alleviate flood risk20To alleviate flood risk to highway for local community.
Community Alert System (CAS)Installation of bollards 10To inform customers within the community of flood risk that will provide time for customers to prepare.

To summarise we plan to:

  • resurface over 55 streets 
  • improve more than 20 footways
  • repair and inspect 11 structures
  • replace hundreds of lighting columns 
  • carry out 10 flood relief schemes

In an average year we repair 3318 potholes.