4.2 Carriageway resurfacing /reconstruction 2025 to 2026
4.21 Classified and bus routes
| Location | Reason for works being undertaken | Indicative cost (£k) | Length km | Benefits |
|---|---|---|---|---|
| A184 Consett route/slip road | Surface/binder course failure | 67 | 337 | Extend life make safe |
| A184 Felling bypass | Surface/binder course failure | 71 | 118 | Extend life make safe |
| A694 Spa Well Road | Loss of skid resistance | 55 | 175 | Safety |
| A1114 Riverside Way | Loss of skid resistance | 20 | 50 | Safety |
| A1288 Birtley Lane | Surface/binder course failure | 39 | 70 | Extend life make safe |
| C302 Lead Road, Greenside | Surface/binder course failure in carriageway | 64 | 240 | Extend life make safe |
| C305 North Street, Winlaton | Surface/binder course failure in carriageway | 55 | 150 | Extend life make safe |
| C307 Dunston Bank, Dunston | Surface/binder course failure in carriageway | 92 | 180 | Extend life make safe |
| C308 Pennyfine Road, Sunniside | Surface/binder course failure in carriageway | 49 | 245 | Extend life make safe |
| Victoria Road, Bensham | Surface/binder course failure in carriageway | 72 | 268 | Extend life make safe |
| C326 Askew Road West, Redheugh | Surface/binder course failure in carriageway | 50 | 130 | Extend life make safe |
| Saltwell View, Saltwell | Surface/binder course failure in carriageway | 86 | 206 | Extend life make safe |
| C315 Coatsworth Road / Whitehall Road, Bensham | Surface/binder course failure in carriageway | 47 | 103 | Extend life make safe |
| C313 Easedale Gardens/Springwell Road/Stanley Gardens, Wrekenton | Surface/binder course failure in carriageway | 45 | 80 | Extend life make safe |
4.22 Unclassified roads
| Location | Reason for works being undertaken | Indicative cost (£k) | Length km | Benefits |
|---|---|---|---|---|
| Strothers Road, High Spen | Surface course failure in carriageway | 24 | 133 | Extend life make safe |
| Stella Bank, Stella - Low priority | Surface course failure in carriageway | 10 | 85 | Extend life make safe |
| Ancrum Way, Whickham | Surface course failure in carriageway | 13 | 65 | Extend life make safe |
| Prospect Terrace, Kibblesworth | Surface course failure in carriageway | 16 | 110 | Extend life make safe |
| Mourne Gardens, Lobley Hill - Low priority. Condition is reasonable | Surface course failure in carriageway | 14 | 106 | Extend life make safe |
| Seventh Avenue, Team Valley | Surface/binder course failure in carriageway | 49 | 101 | Extend life make safe |
| Windermere Street West, Bensham. | Surface course failure in carriageway | 33 | 155 | Extend life make safe |
| King Street, Bensham | Surface course failure in carriageway | 23 | 119 | Extend life make safe |
| Cross Keys Lane, Low Fell | Surface/binder course failure in carriageway | 22 | 122 | Extend life make safe |
| Harewood Green, Bedale Acomb Court, Allerdene. | Surface course failure in carriageway | 30 | 140 | Extend life make safe |
| North Dene, Birtley | Surface course failure in carriageway | 29 | 170 | Extend life make safe |
| Taylor Gardens, Pelaw | Surface course failure in carriageway | 16 | 87 | Extend life make safe |
| Ryhope Gardens, Wrekenton | Surface course failure in carriageway | 24 | 105 | Extend life make safe |
| Suffolk Place | Surface course failure in carriageway | 40 | 210 | Extend life make safe |
| Elder Grove | Surface course failure in carriageway | 20 | 95 | Extend life make safe |
| Dorset Avenue | Surface course failure in carriageway | 10 | 100 | Extend life make safe |
| Windermere Street West (rear) | Surface course failure in carriageway | 15 | 112 | Extend life make safe |
4.23 Back lanes
| Location | Reason for works | Cost £k | Length (metres) | Benefit |
|---|---|---|---|---|
| Derwent Street, Chopwell | Surface course failure | 8 | 70 | Extend life make safe |
| Litchfield Terrace, Winlaton | Surface course failure | 8 | 70 | Extend life make safe |
| Eleanor Terrace / Edith Terrace, Whickham | Surface course failure | 23 | 157 | Extend life make safe |
| Ravensworth Terrace, Dunston | Surface course failure | 21 | 143 | Extend life make safe |
| Caris Street / Roseberry Avenue, Deckham | Surface course failure | 19 | 150 | Extend life make safe |
| Beacon Rise, Sheriff Hill | Surface course failure | 10 | 60 | Extend life make safe |
| Rochester Terrace / Bondene Avenue West, Felling | Surface course failure | 19 | 125 | Extend life make safe |
| West Row / Penshaw View, Birtley | Surface course failure | 20 | 193 | Extend life make safe |
| Chilcrosse (Bleachfield), Leam Lane | Surface course failure | 20 | 120 | Extend life make safe |
| Cowpath Gardens / Croxdale Terrace, Pelaw | Surface course failure | 10 | 110 | Extend life make safe |
| Deneburn / Hallgarth, Leam Lane | Surface course failure | 16 | 110 | Extend life make safe |
4.24 Surface dressing
| Location | Reason for works | Cost £k | Length (metres) | Benefit |
|---|---|---|---|---|
| C305 Pawston Road, Barlow / High Spen | Prepatch and surface dress | 105 | 1250 | Extend life make safe |
| West Lane and Knobbyends Lane, Winlaton | Prepatch and surface dress | 53 | 610 | Extend life make safe |
| Coach Road, Lobley Hill / Lamesley | Prepatch and surface dress | 112 | 2080 | Extend life make safe |
| C306 Fellside Road, Whickham | Prepatch and surface dress | 66 | 435 | Extend life make safe |
4.25 Ultithin programme on unclassified roads
| Location | Reason for works | Cost £k | Length (metres) | Benefit |
|---|---|---|---|---|
| Ridgeway, Leam Lane | Surface course failure | 31 | 330 | Extend life make safe |
| Byron Walk, Keats Walk, Gateshead | Surface course failure | 41 | 161 | Extend life make safe |
| Derwent View, Winlaton | Surface course failure | 24 | 304 | Extend life make safe |
| Park Avenue, Blaydon | Surface course failure | 8 | 71 | Extend life make safe |
| Runnymede Gardens, Chopwell | Surface course failure | 49 | 383 | Extend life make safe |
| Larkspur Road, Whickham | Surface course failure | 38 | 228 | Extend life make safe |
| Blackthorne, Sunniside | Surface course failure | 30 | 131 | Extend life make safe |
| Dunston Road, Dunston | Surface course failure | 24 | 120 | Extend life make safe |
| Heathfield Road, Low Fell | Surface course failure | 32 | 240 | Extend life make safe |
| Holyoake Gardens, Deckham | Surface course failure | 36 | 261 | Extend life make safe |
4.3 Footways
| Area where work is planned | Type of works being undertaken | Indicative cost (£k) | Length (m) | Benefits |
|---|---|---|---|---|
| Mountside Gardens, Dunston Hill | Replace paving flags with asphalt | 42 | 227 | Safety and improved environment. |
| Queens Court, Teams | Replace paving flags with asphalt | 46 | 215 | Safety and improved environment. |
| Jackson Street phase 2, Gateshead | Replace paving flags with asphalt | 63 | 157 | Safety and improved environment. |
| Grisedale / Brampton Gardens, Low Fell (east side) | Replace asphalt with stone paving and kerb works | 43 | 325 | Safety and improved environment. |
| Church Road, Sheriff Hill | Replace paving flags with asphalt | 22 | 93 | Safety and improved environment. |
| Coldwell Park Drive, Felling | Replace paving flags with asphalt | 35 | 154 | Safety and improved environment. |
| Redemarsh, Leam Lane | Replace paving flags with asphalt | 42 | 277 | Safety and improved environment. |
| Jackson Street phase 1 | Re-lay paving flags | 92 | 157 | Safety and improved environment. |
| B6317 Whickham Front Street | Renew existing bitmac footway surfacing | TBC | 220 | Safety and improved environment. |
| Burn Road, Blaydon | Renew existing bitmac footway surfacing | TBC | 290 | Safety and improved environment. |
| Dunston Bank | Renew existing bitmac footway surfacing | TBC | 450 | Safety and improved environment. |
| Chester Gardens, Crawcrook | Renew existing bitmac footway surfacing | TBC | 110 | Safety and improved environment. |
| Redemarsh, Leam Lane | Replace existing flagged footway with Bitmac | TBC | 92 | Safety and improved environment. |
| B6315 Woodside Lane, Greenside | Replace existing flagged footway with Bitmac | TBC | 140 | Safety and improved environment. |
4.4 Structures and bridges
| Area where work is planned | Type of works being undertaken | Indicative cost (£k) | Benefits |
|---|---|---|---|
| Tyne Bridge | Major maintenance with Newcastle City Council | 41,400 | Major maintenance required to ensure future durability of structure. Note Gateshead contribute 40% of cost. |
| Gateshead viaduct | Principal inspection and PTSI stage 1 | 330 | Duty to inspect and maintain structures. Investigation of known issues. |
| Gateshead viaduct | Demolition | 18,000 | Maintenance burden reduced. |
| Allows town centre regeneration | Redheugh Bridge principle inspection | TBC | Duty to inspect and maintain structures. |
| Redheugh Bridge | Coping stabilisation Drainage repairs | 1,000 | Address risk of spalled coping units and piers. |
| Lamesley Road | Brick parapet repair | 10 | Maintain safety features |
| Riding Mill Lane public right of way | Bridge replacement | TBC | Bridge does not have parapets and is at the end of its life. Replacement options being considered. |
| Lintzford Road | Stabilisation of carriageway | 150 (design) TBC (construct) | Reduces risk of landslip and loss of key transport corridor. |
| Scotswood bridge | Principle inspection | TBC | Duty to inspect and maintain structures. |
| Blaydon viaduct | Principle inspection | Duty to inspect and maintain structures. | |
| The Gateshead Millennium Bridge | Principle inspection including mechanical and engineering | TBC | Refurbishment of some mechanical and engineering elements required to ensure continued use of opening. |
4.5 Street lighting
| Area where work is planned | Type of works being undertaken | Indicative cost (£k) | Benefits |
|---|---|---|---|
| Borough wide | Column Replacement Program | 1.5m | Upgrading lighting infrastructure |
| Borough wide | High Mast Lantern Replacement | 61 | Upgrade the lighting at major conflict areas |
| Metrocentre ring road | Duct/cable replacement | 150 | Infrastructure improvement |
| Team Valley | Duct/cable replacement | 100 | Infrastructure improvement |
| Main Gate, Team Valley | LED lantern replacement | 25 | Upgrade the lighting at major conflict areas |
4.6 Drainage /flooding
| Area where work is planned | Type of works being undertaken | Indicative cost (£k) | Benefits |
|---|---|---|---|
| Holburn lane | Installation of two dams and culvert | 100 | To alleviate flood risk to private land and improve existing culvert inlet making it better for future maintenance. |
| Gully repairs | Repair of existing restricted gullies | Not applicable | Maintenance of existing gullies to drain existing highway. |
| Watergate Park reservoir | Implementation of erosion control | 500 | To bring the reservoir to latest specification to reduce risk of life in an event. |
| Ridgeway surface water and flooding alleviation scheme (SWFAS) | Installation of new manhole and gullies. | 40 | To alleviate flood risk to highway for local community. |
| Durham Road SWFAS | Removal of existing drainage and installation of new highway drainage. | TBC | To alleviate flood risk to highway for local community and business. |
| Arran Road SWFAS | Installation of new gully into footway to alleviate flood risk | 20 | To alleviate flood risk to highway for local community. |
| Community Alert System (CAS) | Installation of bollards | 10 | To inform customers within the community of flood risk that will provide time for customers to prepare. |
To summarise we plan to:
- resurface over 55 streets
- improve more than 20 footways
- repair and inspect 11 structures
- replace hundreds of lighting columns
- carry out 10 flood relief schemes
In an average year we repair 3318 potholes.